Skip to main content

Core program

Post-Construction Cleaning

The last trade on site — turning a construction zone into a space you can hand to an owner, a tenant, or a camera crew.

Construction workers reviewing plans inside an unfinished commercial space

Scope of work

What's included

Post-construction cleaning runs in phases keyed to your schedule, not a frequency. We scope from your plans and walk the site before pricing — dust load, floor protection, and access all change the labor math.

Post-Construction Cleaning scope of work by Rough clean, Final clean, Touch-up
Task Rough clean Final clean Touch-up
Remove construction debris, packaging, and protective films to dumpster Included Not included Not included
Scrape and remove stickers, labels, and paint overspray from glass and fixtures Included Not included Not included
Broom-sweep and shop-vac all floors; knock down heavy dust top to bottom Included Not included Not included
Wipe down studs, sills, and ledges ahead of finish trades Included Not included Not included
Detail-clean all interior glass, frames, and window tracks Not included Included Not included
Damp-wipe all walls, doors, frames, and hardware Not included Included Not included
High-dust and wipe ceiling grid, diffusers, sprinkler heads, and light fixtures Not included Included Not included
Detail-clean and sanitize restrooms: fixtures, tile, partitions, mirrors, dispensers Not included Included Not included
Clean inside and out: cabinetry, millwork, shelving, closets, and appliances Not included Included Not included
Machine-scrub hard floors; apply initial finish coats where specified Not included Included Not included
Vacuum all carpet with HEPA-filtered equipment; spot-treat adhesive residue Not included Included Not included
Polish all stainless, chrome, and glass surfaces Not included Included Not included
Remove remaining floor protection and detail underneath Not included Not included Included
Punch-walk support: re-clean areas disturbed by trailing trades Not included Not included Included
Final pass on glass, floors, and touch points before owner walkthrough Not included Not included Included

Best suited for

  • General contractors on commercial builds and tenant improvements
  • Property managers turning over tenant spaces
  • Owners preparing for occupancy, inspection, or photography
  • Remodels and additions in occupied buildings

How we deliver it

We work to your schedule, not ours

Construction schedules move. We hold crew capacity for your window, confirm 48 hours out, and communicate through your superintendent — one point of contact on each side.

Certificates and compliance

Certificates of insurance naming owner and GC, site-specific safety orientation, and PPE compliance are handled before our crews badge in.

Get a number for post-construction.

Five questions, a preliminary range for your facility, and a no-cost site walk to confirm it.

Get an Instant Estimate